Our epoxy floor systems
Solid Color Epoxy
The most traditional forms of epoxy floors, this system consists of a primer, solid-colored epoxy or polyurea base coat and a clear epoxy or polyaspartic topcoat. Light reflective, these floors come in an array of color choices. Logos, glitter, and line markings can be incorporated into the floors.
Total layers 2-3
Total job time 1-2 days
Return to service as short as 2-4 hours of top coat for light traffic and heavy traffic 48-72 hours.
Epoxy Flake flor system
A multi-layered system comprising an epoxy base coat and vinyl flake chips is sealed with either a quick-drying polyaspartic topcoat or a polyurethane topcoat. This system is water and weather-resistant, chip, scratch, chemical and stain-resistant. Ideal for use in residential garages, outdoor surfaces and in busy commercial settings.
Total layers 2-3.
Total job time: 1-2 days.
Return to service after 2-4 hours of top coat for light traffic and heavy traffic 48-72 hours.
Metallic epoxy floors
The most decorative and easily customizable 3D floor system on the market. It's a mixture of colored basecoat and metallic powder pigments, applied using different application techniques. These floors are always one-of-a-kind, stain, scratch and chip-resistant. Non-porous, light-reflective and easy to maintain and clean.
Total layers 3-4.
Total job time ~3-4 days.
Return to service after 16 hours top coat for foot traffic. Light traffic for 2 days. Heavy traffic 2-5 days.
Quartz epoxy floors
This multi-layered system consists of epoxy basecoat epoxy quartz granules and is sealed with a protective topcoat. Extremely durable, stain, chemical, scratch and chip resistant. Weather and waterproof. It is ideal for outdoor settings and industrial/commercial settings that experience constant access to water, moisture and heavy traffic.
Total layers 3-4 depending on single or double broadcast.
Total job time can be up to 4 days depending on the products chosen and single or double broadcast.
Return to service as short as 2-4 hours for foot traffic and heavy traffic 48-72 hours.